Stream Stewardship Trust Fund dollars were allocated to this project to exclude livestock from Shoal Creek and also pay for a permanent protective easement for a 180-ft width of vegetated riparian corridor along this Ozark stream.
Low Water Crossing Replacement
Stream Stewardship Trust Fund dollars were applied to this project to replace a low-water crossing on Mahans Creek with an at-grade, armored stream crossing utilizing concrete matresses. Partner funds ($4,800-in-kind labor and $2,200 base rock) from the Shannon County Commission. Read more
Cracker Neck Branch Grade-Control Structure
Stream Stewardship Trust funds in the amount of $50,000 were provided to install grade-control structures to stabilize the streambed of Cracker Neck Branch a second order tributary (Sac River watershed) and to provide stable crossing for light equipment (Lawrence County).
Niangua River Low-Water Crossing Replacement
Stream Stewardship Trust Fund dollars were allocated to replace a low-water crossing over Niangua River at Williams Ford with a clear-span bridge. Partner funds ($55,000) from Dallas County Commission, ($144,900 federal stimulas funds) from ARRA, and ($10,000) from MDC. 30-year easement.
Little Niangua River Low-Water Crossing Replacement
Stream Stewardship Trust Fund dollars were allocated to replace a low-water crossing over Little Niangua River at Dallas County School Road with a clear-span bridge. Partner funds ($25,000) from Dallas County Commission, ($75,000) from USFWS & ($20,000) from MDC. 30-yr easement.
- « Previous Page
- 1
- …
- 15
- 16
- 17
- 18
- 19
- …
- 24
- Next Page »